Newsletter

Successful commissioning of an entire low energy section heavy ion accelerator ::::: article

The heavy ion accelerator built in Shin-dong, Daejeon

Beam for the first time in the entire low energy acceleration section

Withdrawal and commissioning were successful.

Foundation for Basic Science, Heavy Ion Accelerator Research Centre

On the 23rd, a low energy accelerator tube of about 110 m

Beam extraction was successful in 124 aircraft, and domestic accelerators

Even in the expert meeting and the committee overseen by the Ministry of Science and ICT

He said he recognized the results.

The research center will continue to optimize performance and

He explained that the accelerator can be implemented in earnest from the second half of next year after research proposals have been selected.

The world’s first heavy ion accelerator

A low energy accelerator tube and a high energy accelerator tube at the same time

It is a research facility to be equipped, but the construction of the high energy accelerator is delayed.

Trending