A significant investment in enduring waste management is coming to Egypt’s Sharqeya Governorate. On December 18, 2023, officials witnessed the signing of a 15-year contract between Sharqeya Governorate and Gaia Titan, the green energy division of Titan Cement, to construct and operate three municipal solid waste treatment facilities.
Strategic Facility Locations
The new facilities will be strategically located across the governorate: in Al-Ghar (within the Zagazig district), Al-Khattara (Husseiniya district), and Geeta (Belbeis district). The agreement also encompasses the operation of two sanitary landfill sites,situated in Belbeis and Al-Khattara,dedicated to the environmentally sound disposal of residual waste.
Processing Capacity and environmental Impact
The project is designed to process a minimum of 3,000 tonnes of waste daily throughout Sharqeya Governorate. This substantial capacity will enable the treatment of over one million tonnes of municipal solid waste annually,diverting it from conventional disposal methods.A key outcome will be the production of approximately 200,000 tonnes of option fuel each year,reducing reliance on conventional energy sources.
Investment and Long-Term Goals
With a total investment reaching up to EGP 500 million, the initiative represents a major step towards improved environmental sustainability in the region.Gaia Titan anticipates a significant reduction in carbon emissions and enhanced operational efficiency through adherence to stringent environmental standards. This project directly supports Titan Cement’s broader strategy to promote green construction practices and maximize the utilization of alternative fuels.
Acting Minister of Environment Manal Awad emphasized the project’s importance in ensuring the safe and responsible disposal of waste, while Sharqeya Governor Hazem al-Ashmouny highlighted the benefits for the local community.
