Lead Service Line Replacement Program Begins – Water Utility
Des Moines Tackles Lead Water Lines: Drake Neighborhood First in Major Replacement Initiative
Des Moines Water Works is embarking on a significant initiative too replace lead water service lines, starting with the Drake neighborhood. This crucial project aims to ensure the safety and quality of drinking water for residents, addressing a legacy issue stemming from older infrastructure.
The Scope of the Lead Pipe Problem
Water service lines, the underground pipes connecting the main water supply to homes and businesses, are the focus of this extensive replacement effort. Historically, between 1873 and 1940, lead pipes were commonly used for the portion of the service line from the water main to the stop box, often located near sidewalks.The remaining section, from the stop box to the property, was typically made of galvanized steel. After 1950, copper became the standard material, though a transitional period between 1940 and 1950 saw the use of both copper and lead.
Des Moines Water Works officials emphasize that the water itself is lead-free. However, the presence of lead in the service lines can potentially leach lead into the water before it reaches the tap.
Federal Mandate and Local Action
The U.S. Environmental Protection Agency (EPA) unveiled new rules in 2024, mandating that public water utilities identify and replace all lead water service lines by 2037. Iowa faces a substantial challenge,with an estimated over 100,000 lead service lines statewide,and a significant portion,around 20,000,located within Des Moines.
The Drake project, funded in part by the State Revolving Fund, is estimated to cost between $4 million and $4.8 million.The broader effort to replace 1,000 lead water service lines is projected to cost $12.1 million, highlighting the substantial investment required to address this issue across the city.
Drake Neighborhood: The Pilot Program
Residents in the Drake area will be directly contacted by Des Moines Water Works regarding the lead pipe replacement program. Interaction will occur through various channels, including mailings, phone calls, and emails.To ensure widespread awareness, details will also be disseminated at neighborhood meetings and other community outreach events.Amy Kahler, CEO and General Manager of Des Moines Water Works, stressed the importance of resident engagement. “It’s crucial that any property owner or tenant who receives a letter from Des Moines Water Works reads it as it will contain information about how to access their free service line replacement,” she stated in a prepared release.
Timeline for Replacement
The physical replacement of the water lines in the Drake neighborhood is scheduled to commence in October and is expected to continue through 2026. This phased approach allows for efficient management of the project and minimizes disruption to residents.
This initiative represents a critical step forward for Des Moines water Works in its commitment to providing safe and reliable drinking water for all its customers, addressing the historical use of lead in its infrastructure.
