Skip to main content
News Directory 3
  • Business
  • Entertainment
  • Health
  • News
  • Sports
  • Tech
  • World
Menu
  • Business
  • Entertainment
  • Health
  • News
  • Sports
  • Tech
  • World
New Women-Parents-Children Center Construction Begins at Marseille's La Timone Hospital - News Directory 3

New Women-Parents-Children Center Construction Begins at Marseille’s La Timone Hospital

September 26, 2026 Jennifer Chen Health
News Context
At a glance
  • The Assistance publique des hôpitaux de Marseille is advancing its hospital modernization project at CHU La Timone with the construction of a new 49,000-square-foot Women, Parents, and Children...
  • Located along the chemin de l'armée d'Afrique in the fifth arrondissement of Marseille, the new building features eight total levels.
  • The broader infrastructure update relies on an investment envelope exceeding one billion euros allocated across the 2022 to 2030 timeframe.
Original source: laprovence.com

The Assistance publique des hôpitaux de Marseille is advancing its hospital modernization project at CHU La Timone with the construction of a new 49,000-square-foot Women, Parents, and Children center. Funded by an investment program spanning 2022 to 2030, the facility brings together pediatric services with gynecology, obstetrics, and neonatology departments previously located at La Conception hospital.

Infrastructure and Site Development at CHU La Timone

Located along the chemin de l’armée d’Afrique in the fifth arrondissement of Marseille, the new building features eight total levels. Five floors are dedicated to patient care spaces complete with an outdoor terrace, while two levels provide parking reserved for hospital personnel, topped by a rooftop belvedere. Demolition work on the older G buildings and the former Timone nursery took place over the previous year. Heavy construction activity ramped up with three active tower cranes and approximately one hundred workers on site pouring concrete and establishing the foundation framework.

Investment and Regional Public Funding

The broader infrastructure update relies on an investment envelope exceeding one billion euros allocated across the 2022 to 2030 timeframe. Exceptional state contributions from the national recovery plan alongside funding from territorial collectives—including the Région, the Bouches-du-Rhône department, the Métropole, and the City of Marseille—finance the initiative. Within this regional modernization effort, the dedicated center featuring a level 3 maternity unit represents a distinct capital cost of 268 million euros. Project timelines project completion and operational readiness by 2029.

L’hôpital Femmes-Parents-Enfants de la Timone commence à sortir de terre

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Keep reading

  • Honolulu EMS Breaks Ground on New $5.3M Kahuku Station
  • MD Anderson Researchers Highlight Radiation Precision and Genomic Testing at ASTRO 2026

Related

2026, building, construction, cri :, Last, Maternity, new, the hospital

Search:

News Directory 3

News Directory 3 catalogs US newspapers, news services, newsstands and digital news outlets across all 50 states. Browse local publishers by city, state, or topic, and follow current headlines linked back to their original sources.

Quick Links

  • Disclaimer
  • Terms and Conditions
  • About Us
  • Advertising Policy
  • Contact Us
  • Cookie Policy
  • Editorial Guidelines
  • Privacy Policy

Browse by State

  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado

© 2026 News Directory 3. All rights reserved.
For contact, advertising, copyright, issues email: office@newsdirectory3.com