Traditional Restaurant Before Demolition: First Look at New Building
- HAMM, Germany – The Jägerhof area on barsener Strasse in Bockum-Hövel is now fenced off, signaling the impending demolition of the conventional restaurant that closed more than two...
- Architect Ralf Birkholz, managing director of Plan-B GmbH, confirmed the plans, stating he is working on behalf of an anonymous Berlin investor.
- Birkholz anticipates construction to begin "in the best case" this year, or next year, pending clarification of financing.
Condominiums to Replace Jägerhof Restaurant in hamm
HAMM, Germany – The Jägerhof area on barsener Strasse in Bockum-Hövel is now fenced off, signaling the impending demolition of the conventional restaurant that closed more than two years ago. an investor from Berlin plans to construct two apartment buildings with 44 condominiums on the nearly 4,300-square-meter site.
Architect Ralf Birkholz, managing director of Plan-B GmbH, confirmed the plans, stating he is working on behalf of an anonymous Berlin investor.

Demolition Imminent for Traditional Restaurant
Birkholz anticipates construction to begin “in the best case” this year, or next year, pending clarification of financing. The construction fence is in place to prevent unauthorized access and deter illegal dumping, after a car dealerS permit to park vehicles on the site was revoked.
Plan-B GmbH is also involved in the construction of luxury apartments at Südstraße 45 near Hamm’s town hall.

An animation shows the planned apartment buildings, including the entrance to the underground car park with 55 spaces. © Plan-B GmbH, Dipl. Ing (FH) architect Ralf Birkholz
The multi-family houses are planned as two-story buildings with a relay floor. A planned underground car park will offer 55 parking spaces. The condominiums will range from 55 to 110 square meters, totaling 3,020 square meters of living space. Elevators will provide accessibility,and Birkholz described the planned features as “upscale equipment.”
Energy-Efficient Design
The project aims for energy efficiency, targeting KfW-40 standards. Heating will be provided by a heat pump system, including ventilation. Photovoltaic systems on the roofs will convert solar energy into electricity. The facade will feature a cleaning facade at the bottom, with a wood-based material covering the relay floor.
The building permit was granted in autumn 2024, according to
wa.de
. The property had been offered online for 2.3 million euros. birkholz said the Berlin investor has as decided against selling the property.
Construction costs are estimated at around 9 million euros, with a construction period of 18 months to two years, depending on weather conditions. Marketing of the apartments will begin at the start of construction, allowing potential buyers to customize interior designs.
The Jägerhof,operated by its last host couple for over 18 years,closed at the end of 2022 following renovations on Barsener Straße. A sale of the complete inventory followed. Before the pandemic,the Jägerhof hosted numerous clubs and bowling leagues.
# Condominiums Replacing Jägerhof Restaurant in Hamm: Frequently Asked Questions
This article provides information about teh construction of new condominiums on the former site of the Jägerhof restaurant in Hamm, Germany.
## What is happening at the Jägerhof site in Hamm?
The Jägerhof area on Barsener Straße in Bockum-Hövel, Hamm, is being redeveloped. The traditional restaurant, which closed over two years ago, is being demolished to make way for two apartment buildings. These buildings will house 44 condominiums.
## Who is behind this project?
an anonymous investor from Berlin is funding the project.Architect Ralf Birkholz, managing director of Plan-B GmbH, is working on behalf of the investor.
## What are the plans for the new buildings?
The plans include two multi-family houses, each with two stories and a relay floor. There will be an underground car park with 55 parking spaces. The condominiums will range from 55 to 110 square meters of living space, totaling 3,020 square meters. Elevators will be included, and the features are described as “upscale equipment”.
## What is the anticipated timeline for construction?
Construction is hoped to begin “in the best case” this year or next year, but this is pending clarification of financing. Construction is estimated to take 18 months to two years, depending on weather conditions.
## When will the apartments be available for purchase?
marketing for the apartments will begin at the start of construction. This will allow potential buyers to customize interior designs.
## What measures are being taken for energy efficiency?
The project is designed with energy efficiency in mind,targeting KfW-40 standards. this will be accomplished through:
* A heat pump system for heating, including ventilation.
* Photovoltaic systems on the roofs to generate electricity from solar energy.
* A cleaning facade at the bottom of the building.
* Wood-based material covering the relay floor.
## What was the Jägerhof restaurant like?
The Jägerhof was operated by its last host couple for over 18 years and closed at the end of 2022 following renovations.Before the pandemic, it hosted numerous clubs and bowling leagues. A sale of the complete inventory followed its closure.
## How much is the construction expected to cost?
Construction costs are estimated at around 9 million euros.
## Key Project Details Summary
| Feature | Details |
|---|---|
| Location | Jägerhof area, Barsener Straße, bockum-Hövel, Hamm, Germany |
| Proposed Development | Two apartment buildings with 44 condominiums |
| Investor | Anonymous Berlin investor |
| Architect | Ralf Birkholz, plan-B GmbH |
| Living Space | 3,020 square meters total |
| Condominium Sizes | 55 to 110 square meters |
| Parking | Underground car park with 55 spaces |
| energy Efficiency | KfW-40 standards, heat pump, solar panels |
| Estimated Construction Cost | 9 million euros |
| Construction Timeline | 18 months to 2 years |
