Skip to main content
News Directory 3
  • Business
  • Entertainment
  • Health
  • News
  • Sports
  • Tech
  • World
Menu
  • Business
  • Entertainment
  • Health
  • News
  • Sports
  • Tech
  • World
Flood Alert: Mae Ngad Dam on Brink of Overflow, Chiang Mai City Next in Line for Deluge - News Directory 3

Flood Alert: Mae Ngad Dam on Brink of Overflow, Chiang Mai City Next in Line for Deluge

September 25, 2024 Catherine Williams News
News Context
At a glance
  • Only 54 centimeters left, Mae Ngat Sombun Chon Dam Water is expected to overflow the emergency building at 1:00 tonight, arriving in Chiang Mai city around 17:00.
  • Chalermkiat Inthakanok, Director of Mae Faek-Mae Ngat Somboonchon Water Supply and Maintenance Project, Chiang Mai, revealed that now there are still 54 centimeters left, the water will overflow...
  • Mr Chalermkiat confirmed that so far the Mae Ngat Somboon Chon Dam is still acting to dampen the water as much as possible.
Original source: thairath.co.th

Mae Ngat Sombun Chon Dam Water Expected to Overflow Tonight

Only 54 centimeters left, Mae Ngat Sombun Chon Dam Water is expected to overflow the emergency building at 1:00 tonight, arriving in Chiang Mai city around 17:00.

Water Level Update

On September 25, 2024, Mr. Chalermkiat Inthakanok, Director of Mae Faek-Mae Ngat Somboonchon Water Supply and Maintenance Project, Chiang Mai, revealed that now there are still 54 centimeters left, the water will overflow from the emergency spillway building or emergency spillway from the analysis. The amount of water entering the dam is 6 centimeters per hour. It is expected to be around 1 am.

Preparations to Minimize Damage

Mr Chalermkiat confirmed that so far the Mae Ngat Somboon Chon Dam is still acting to dampen the water as much as possible. To reduce the damage to the city centre which is an economic zone

Mae Ngat Sombun Chon Dam Preparations

Affected Areas

After the water overflow in the emergency drainage building, only 3 subdistricts, namely Inthakhin Subdistrict, Cholae Subdistrict and Ban Pao Subdistrict, will be affected. The water in the Ping River will rise by another 20-50 centimeters, by which time the water level at P.75 Ban Cho Lae, Mae Taeng District, Chiang Mai Province, which comes from Chiang Dao, will have already decreased. And the water overflowing from the emergency building tonight is expected to reach P.1 Nawarat Bridge, Mueang District, Chiang Mai Province, around 5:00 pm tomorrow.

Affected Areas in Chiang Mai

Monitoring and Analysis Center

In this regard, the Mae Faek – Mae Ngat Sombun Chon Water Supply and Maintenance Project A center has been set up to analyze and monitor the water situation 24 hours a day to prepare for any situation.

Monitoring and Analysis Center

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Related

Chiang Mai

Search:

News Directory 3

News Directory 3 catalogs US newspapers, news services, newsstands and digital news outlets across all 50 states. Browse local publishers by city, state, or topic, and follow current headlines linked back to their original sources.

Quick Links

  • Disclaimer
  • Terms and Conditions
  • About Us
  • Advertising Policy
  • Contact Us
  • Cookie Policy
  • Editorial Guidelines
  • Privacy Policy

Browse by State

  • Alabama
  • Alaska
  • Arizona
  • Arkansas
  • California
  • Colorado

© 2026 News Directory 3. All rights reserved.
For contact, advertising, copyright, issues email: office@newsdirectory3.com