Opening Date: A Comprehensive Guide
Here’s a breakdown of the information provided, organized for clarity:
1. Commute Times (35 minutes)
The following locations are listed,presumably as potential destinations within a 35-minute commute:
Recoleta
Santiago
San Miguel
San Joaquín
The Farm
San Ramón
The Pintana
High bridge
2. Santiago Metro Line 9 – Stage 1 (Opening 2030)
This section details the planned stations for the first stage of Line 9 of the Santiago Metro.All stations are along Santa Rosa Avenue, wiht cross streets indicated. Several stations will have connections to other metro lines.
Bío Bío (San Miguel) – Combination with Line 6
Santa Rosa av. With Mayor Pedro Alarcón (San Miguel/San Joaquín)
Santa Rosa Av. With Av. Salvador Allende (San Miguel/San Joaquín)
Santa Rosa Av. With Departmental Av. (San Miguel/san Joaquín)
Santa Rosa Av. With Av. Lo ovalle (La Granja/San Ramón/San Joaquín/San Miguel)
Santa Rosa Av. With Linares (La Granja/san Ramón)
Santa Rosa (La Granja/San Ramón) – combination with Line 4A
Santa Rosa Av. With Esperanza,Padre Hurtado Hospital (La Granja/San Ramón)
Santa Rosa Av. With Av. Observatory (La Pintana)
Santa Rosa Av. With Baldomero Lillo, Plaza La Pintana (La Pintana)
Key Observations:
Geographic Focus: Line 9 appears to be focused on the southern and southeastern areas of Santiago, specifically along Santa Rosa Avenue.
Interconnectivity: The line is designed to integrate with existing lines (4A and 6) for easier transfers.
neighborhoods Served: The stations serve a range of neighborhoods including San Miguel, San Joaquín, La Granja, San Ramón, and La Pintana.
Future Planning: the information is based on plans for a 2030 opening.
